BIGGE CRANE & RIGGING HEAVY HAUL PROJECT SCHEDULE

8/17/2018 12:00:00 AM

PLEASE OPEN THIS NEWS ITEM TO OBTAIN THE SCHEDULE FOR THE BIGGE AND CRANE GENERAL ELECTRIC HEAVY HALL PROJECT IN THE CITY OF RENSSELAER

THE PROJECT IS SCHEDULED TO BEGIN ON TUESDAY TUESDAY, MAY 15.  THIS PAGE WILL CONTINUE TO UPDATE AS INFORMATION IS RECEIVED.

ADDITIONAL INFO UPDATED SEPTEMBER 10, 2018

.

 

Tuesday Night (9/11/18):

Loaded Unit 3 Gas Turbine Generator on trailer T3 (16 axle line suspension) from Port of Rensselaer to Copake Parking –         Gus Walley @ (832) 459-0094  -             Inspection 3:00 pm, Drivers @ 5:00 pm, Civilian Escorts at 6:00 pm, Prehaul meeting at 8:00 pm, Haul starts at 9:00 pm, Parked in Copake ~ 4:00-5:00 am

 

 

Bigge Crane & Rigging Transports for Cricket Valley Energy Center

Port: Port of Rensselaer, 40 Riverside Drive, Rensselaer, NY 12144

Project:  10-06-028101 (GE)

Copake: Leased Parking, 7916 SR-22, Copake Falls, NY 12517

 

By:

Jay Holt

(406) 273-1630

CVEC: Cricket Valley Energy Center, 2241 SR-22, Dover Plains, NY 12522

 

T1: Trailer 1 - (11) Line Continuous Deck HRSG trailer

 

Final Permit Issued

Permit Applied For

Completed

T2: Trailer 2 - (11) Line Continuous Deck HRSG trailer

 

 

FULL TRANSPORT ARRANGEMENT

Max #

Config

Night 1 Start

Night

Start

End

Last Haul Night

Night

Start

End

Application

 

QTY

Description

L  (ft)

W (ft)

H (ft)

Wt (lb)

Tractors

#

Date & Time

1

From

At

Start Date & Time

2

From

At

ID #

 

1

Unit 3 - Gas Turbine Generator

380'-0 3/4"

22'-6"

15'-10 1/4"

1,186,400

4

T3

9/11/18 9:00 PM

Tue

Port

Copake

9/12/18 9:00 PM

Wed

Copake

CVEC

2098375

 

---

U3 GTG Empty Return

292'-6"

22'-6"

14'-6"

555,824

2

T3

9/13/18 9:00 PM

Thu

CVEC

Port

N/A

N/A

N/A

N/A

2098376

 

---

U3 GTG Empty Tandem PM12

34'-6"

8'-5"

12'-10"

72,000

1

---

9/13/18 9:00 PM

Thu

CVEC

Port

N/A

N/A

N/A

N/A

2098377

 

---

U3 GTG Empty Tandem PM13

34'-6"

8'-5"

12'-10"

72,000

1

---

9/13/18 9:00 PM

Thu

CVEC

Port

N/A

N/A

N/A

N/A

2098378

 

1

Unit 1 - ST IP/LP Section

223'-1 1/2"

18'-0 1/8"

18'-10"

666,720

2

T4

9/24/18 9:00 PM

Mon

Port

Parking

9/26/18 9:00 PM

Wed

Copake

CVEC

2104204

 

---

U1  ST IP/LP Section Empty Return

223'-1 1/2"

18'-0 1/8"

12'-10"

332,720

2

T4

9/27/18 9:00 PM

Thu

CVEC

Port

N/A

N/A

N/A

N/A

2104247

 

 

Bigge Crane & Rigging Transports for Cricket Valley Energy Center Port: Port of Rensselaer, 40 Riverside Drive, Rensselaer, NY 12144
Project:  10-06-028101 (GE) Copake: Leased Parking, 7916 SR-22, Copake Falls, NY 12517
By: Jay Holt (406) 273-1630 CVEC: Cricket Valley Energy Center, 2241 SR-22, Dover Plains, NY 12522
T1: Trailer 1 - (11) Line Continuous Deck HRSG trailer
Final Permit Issued Permit Applied For Completed T2: Trailer 2 - (11) Line Continuous Deck HRSG trailer
FULL TRANSPORT ARRANGEMENT Max # Config Night 1 Start Night Start End Last Haul Night Night Start End Application Old Speed Tire Pr Tire Rating Axle Rating
# QTY Description L  (ft)  W (ft)  H (ft) Wt (lb) Tractors # Date & Time 1 From At Start Date & Time 2 From At ID # App ID# kph mph bar psi kg lb lb kg
35 1 Unit 3 - Gas Turbine 380'-0 3/4" 22'-6" 15'-7 3/4" 1,143,200 4 T3 9/5/18 9:00 PM Wed Port Copake 9/6/18 9:00 PM Thu Copake CVEC 2097343 40 24.85 9.4 136.3 25070.0 55269.8 53000 24040.4
  --- U3 GT Empty Return 292'-6" 22'-6" 14'-6" 555,824 2 T3 9/9/18 9:00 PM Sun CVEC Port N/A N/A 0 N/A 2097348   44 27.34 9.3 135.2 23635.0 52106.2 52011.0 23591.8
  --- U3 GT Empty Tandem PM12 34'-6" 8'-5" 12'-10" 72,000 1 --- 9/9/18 9:00 PM Sun CVEC Port N/A N/A N/A N/A 2097350                  
  --- U3 GT Empty Tandem PM13 34'-6" 8'-5" 12'-10" 72,000 1 --- 9/9/18 9:00 PM Sun CVEC Port N/A N/A N/A N/A 2097351                  
36 1 Unit 3 - Gas Turbine Generator 380'-0 3/4" 22'-6" 15'-10 1/4" 1,186,400 4 T3 9/11/18 9:00 PM Tue Port Copake 9/12/18 9:00 PM Wed Copake CVEC 2098375 40 24.85 9.4 136.3 25070.0 55269.8 53000 24040.4
  --- U3 GTG Empty Return 292'-6" 22'-6" 14'-6" 555,824 2 T3 9/13/18 9:00 PM Thu CVEC Port N/A N/A N/A N/A 2098376   44 27.34 9.3 135.2 23635.0 52106.2 52011.0 23591.8
  --- U3 GTG Empty Tandem PM12 34'-6" 8'-5" 12'-10" 72,000 1 --- 9/13/18 9:00 PM Thu CVEC Port N/A N/A N/A N/A 2098377                  
  --- U3 GTG Empty Tandem PM13 34'-6" 8'-5" 12'-10" 72,000 1 --- 9/13/18 9:00 PM Thu CVEC Port N/A N/A N/A N/A 2098378                  
37 1 Unit 1 - IP Shell, LP Hood & Rotor Asm 223'-1 1/2" 18'-0 1/8" 18'-7 5/8" 644,280 2 T4 9/24/18 9:00 PM Mon Port Parking 9/26/18 9:00 PM Wed Copake CVEC  
38 1 Unit 1 - HP Shell & Rotor 223'-1 1/2" 18' 0 1/8" 14'-9 5/8" 548,030 2 T4 9/30/18 9:00 PM Sun Port CVEC N/A N/A N/A N/A  
39 1 Unit 1 - Steam Turbine Generator 380'-0 3/4" 22'-6" 15'-9 3/4" 1,186,400 4 T3 10/2/18 9:00 PM Tue Port Copake 10/3/18 9:00 PM Wed Copake CVEC  
40 1 Unit 2 - IP Shell, LP Hood & Rotor Asm 223'-1 1/2" 18'-0 1/8" 18'-7 5/8" 644,280 2 T4 10/24/18 9:00 PM Wed Port Parking 10/28/18 9:00 PM Sun Copake CVEC  
41 1 Unit 2 - HP Shell & Rotor 223'-1 1/2" 18' 0 1/8" 14'-9 5/8" 548,030 2 T4 10/30/18 9:00 PM Tue Port CVEC N/A N/A N/A N/A  
42 1 Unit 2 - Steam Turbine Generator 380'-0 3/4" 22'-6" 15'-9 3/4" 1,186,400 4 T3 11/4/18 9:00 PM Sun Port Copake 11/5/18 9:00 PM Mon Copake CVEC  
43 1 Unit 3 - IP Shell, LP Hood & Rotor Asm 223'-1 1/2" 18'-0 1/8" 18'-7 5/8" 644,280 2 T4 11/26/18 9:00 PM Mon Port Parking 11/28/18 9:00 PM Wed Copake CVEC  
44 1 Unit 3 - HP Shell & Rotor 223'-1 1/2" 18' 0 1/8" 14'-9 5/8" 548,030 2 T4 12/2/18 9:00 PM Sun Port CVEC N/A N/A N/A N/A  
45 1 Unit 3 - Steam Turbine Generator 380'-0 3/4" 22'-6" 15'-9 3/4" 1,186,400 4 T3 12/4/18 9:00 PM Tue Port Copake 12/5/18 9:00 PM Wed Copake CVEC  
11 Total # of Remaining Loaded Transports
Notes:
1) Does account for known NYDOT Holiday restrictions
2) Does not account for any weather delays, unexpected permitting issues, etc.
3) HRSG Module loaded moves from Port of Rensselaer to Cricket Valley are now assumed to be (1) night hauls
4) Empty return trips are now assumed to be (1) night
5) HRSG Modules will be hauled on (2) similar dual-lane transporters
6) Deleted
7) All other components will be hauled on (1) transporter
8) Plan on using a maximum of (2) transport crews at any (1) time
9) Plan on a transload/loading crew at the Port
10) Plan on using an offload/storage/hook delivery crew at Site
11) Configuration # Legend: T1 = (11)-Line Continuous Goldhofer THP/CA
T2 = (11)-Line Continuous Goldhofer THP/CA
T3 = (8)-Line Suspension/Bolstered (8)-Line Goldhofer THP/DL
T4 = (5)-Line Drop Deck (5)-Line Goldhofer THP/CA
Miscellaneous Trip Permits
2070611 6/4/18 Empty Return of PM13  
2071138 6/4/18 Empty Return of PM10  
2073201 6/8/18  Empty PM12 Port to Site
2076440 6/18/18 Empty Return of PM13  
2076444 6/19/18  Empty PM12 Port to Site
2096671 8/14/18 Empty Return of PM13  